HB646: Electrical transmission lines; State Corporation Commission review. 

Chief Patron

Del. Clarke Hogan (R-60)

Clarke Hogan (R-60)
South Boston, VA
Served: 2002–

Progress

Yes Introduced
No Passed Committee
Passed House
Passed Senate
Signed by Governor
Became Law

Status

02/12/2008: Failed to Pass in Committee

View Entire History

Summary

Electrical transmission lines; State Corporation Commission review.  Requires the State Corporation Commission, when verifying the applicant's load flow modeling, contingency analyses, and reliability needs presented to justify a new electrical transmission line, to assume (i) participation in the renewable portfolio standard program and achievement of its goals, (ii) the maximum effective conservation of energy used by public utilities, and (iii) full compliance with the energy consumption requirements for federal buildings. The measure also requires the applicant to provide the Commission with such information as it requires to make the verification.

  View Full Text »

Video

Votes were cast on this bill on the following dates for which Richmond Sunlight has video: 01/25/2008, 02/05/2008 and 02/12/2008.

Identical Bills

The following bills are identical to this one: SB541

Patron: Mark Obenshain
Introduced: 2008-01-09
Status: in subcommittee
.

Support the
			Virginia Interfaith Center

Poll Results

No Richmond Sunlight visitors voted on this bill while voting was open.

?

Tags

Separate each tag with a space: tax highway vdot. Multiple word tags must be enclosed within quotes: “capital murder”.

Bill Text

Subscribe

RSS Feed Keep track of the status of this bill as it moves through the General Assembly — subscribe via RSS.