HB639: Investor-owned electric utilities; regulation of rates by State Corporation Commission.
Be it enacted by the General Assembly of Virginia:
1. That §§ 56-235.2, 56-249.6, 56-577, 56-580, 56-581, 56-585.1, 56-585.2, and 56-598 of the Code of Virginia are amended and reenacted as follows:
§ 56-235.2. All rates, tolls, etc., to be just and reasonable to jurisdictional customers; findings and conclusions to be set forth; alternative forms of regulation for electric companies.
A. Any rate, toll, charge or schedule of any public utility
operating in this Commonwealth shall be considered to be just and reasonable
only if: (1) the public utility has demonstrated that such rates, tolls,
charges or schedules in the aggregate provide revenues not in excess of the
aggregate actual costs incurred by the public utility in serving customers within
the jurisdiction of the Commission, including subject to such normalization
for nonrecurring costs and annualized adjustments for known
future increases in costs
as the Commission finds reasonably can
be predicted to occur during the rate year may deem reasonable, and a
fair return on the public utility's rate base used to serve those
jurisdictional customers, which return shall be calculated in accordance with §
56-585.1 for utilities subject to such section; (1a) the investor-owned public
electric utility has demonstrated that no part of such rates, tolls, charges or
schedules includes costs for advertisement, except for advertisements either
required by law or rule or regulation, or for advertisements which solely
promote the public interest, conservation or more efficient use of energy; and
(2) the public utility has demonstrated that such rates, tolls, charges or
schedules contain reasonable classifications of customers. Notwithstanding §
56-234, the Commission may approve, either in the context of or apart from a
rate proceeding after notice to all affected parties and hearing, special
rates, contracts or incentives to individual customers or classes of customers
where it finds such measures are in the public interest. Such special charges
shall not be limited by the provisions of § 56-235.4. In determining costs of
service, the Commission may use the test year method of estimating revenue
needs, but shall not consider any adjustments or
expenses that are speculative or cannot be predicted with reasonable certainty.
In any Commission order establishing a fair and reasonable rate of return for
an investor-owned gas, telephone or electric public utility, the Commission
shall set forth the findings of fact and conclusions of law upon which such
order is based.
For ratemaking purposes, the Commission shall determine the federal and state income tax costs for investor-owned water, gas, or electric utility that is part of a publicly-traded, consolidated group as follows: (i) such utility's apportioned state income tax costs shall be calculated according to the applicable statutory rate, as if the utility had not filed a consolidated return with its affiliates, and (ii) such utility's federal income tax costs shall be calculated according to the applicable federal income tax rate and shall exclude any consolidated tax liability or benefit adjustments originating from any taxable income or loss of its affiliates.
B. The Commission shall, before approving special rates, contracts, incentives or other alternative regulatory plans under subsection A, ensure that such action (i) protects the public interest, (ii) will not unreasonably prejudice or disadvantage any customer or class of customers, and (iii) will not jeopardize the continuation of reliable electric service.
C. After notice and public hearing, the Commission shall issue guidelines for special rates adopted pursuant to subsection A that will ensure that other customers are not caused to bear increased rates as a result of such special rates.
§ 56-249.6. Recovery of fuel and purchased power costs.
A. 1. Each electric utility that purchases fuel for the generation of electricity or purchases power and that was not, as of July 1, 1999, bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, shall submit to the Commission its estimate of fuel costs, including the cost of purchased power, for the 12-month period beginning on the date prescribed by the Commission. Upon investigation of such estimates and hearings in accordance with law, the Commission shall direct each company to place in effect tariff provisions designed to recover the fuel costs determined by the Commission to be appropriate for that period, adjusted for any over-recovery or under-recovery of fuel costs previously incurred.
2. The Commission shall continuously review fuel costs and if it finds that any utility described in subdivision A 1 is in an over-recovery position by more than five percent, or likely to be so, it may reduce the fuel cost tariffs to correct the over-recovery.
3. Beginning July 1, 2009, for all utilities described in subdivision A 1 and subsection B, if the Commission approves any increase in fuel factor charges pursuant to this section that would increase the total rates of the residential class of customers of any such utility by more than 20 percent, the Commission, within six months following the effective date of such increase, shall review fuel costs, and if the Commission finds that the utility is, or is likely to be, in an over-recovery position with respect to fuel costs for the 12-month period for which the increase in fuel factor charges was approved by more than five percent, it may reduce the utility's fuel cost tariffs to correct the over-recovery.
B. All fuel costs recovery tariff provisions in effect on January 1, 2004, for any electric utility that purchases fuel for the generation of electricity and that was, as of July 1, 1999, bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, shall remain in effect until the later of (i) July 1, 2007 or (ii) the establishment of tariff provisions under subsection C. Any such utility shall continue to report to the Commission annually its actual fuel costs, including the cost of purchased power.
C. Each electric utility described in subsection B shall submit annually to the Commission its estimate of fuel costs, including the cost of purchased power, for successive 12-month periods beginning on July 1, 2007, and each July 1 thereafter. Upon investigation of such estimates and hearings in accordance with law, the Commission shall direct each such utility to place in effect tariff provisions designed to recover the fuel costs determined by the Commission to be appropriate for such periods, adjusted for any over-recovery or under-recovery of fuel costs previously incurred; however, (i) no such adjustment for any over-recovery or under-recovery of fuel costs previously incurred shall be made for any period prior to July 1, 2007, and (ii) the Commission shall order that the deferral portion, if any, of the total increase in fuel tariffs for all classes as determined by the Commission to be appropriate for the 12-month period beginning July 1, 2007, above the fuel tariffs previously existing, shall be deferred without interest and recovered from all classes of customers as follows: (i) in the 12-month period beginning July 1, 2008, that part of the deferral portion of the increase in fuel tariffs that the Commission determines would increase the total rates of the residential class of customers of the utility by four percent over the level of such total rates in existence on June 30, 2008, shall be recovered; (ii) in the 12-month period beginning July 1, 2009, that part of the balance of the deferral portion of the increase in fuel tariffs, if any, that the Commission determines would increase the total rates of the residential class of customers of the utility by four percent over the level of such total rates in existence on June 30, 2009, shall be recovered; and (iii) in the 12-month period beginning July 1, 2010, the entire balance of the deferral portion of the increase in fuel tariffs, if any, shall be recovered. The "deferral portion of the increase in fuel tariffs" means the portion of such increase in fuel tariffs that exceeds the amount of such increase in fuel tariffs that the Commission determines would increase the total rates of the residential class of customers of the utility by more than four percent over the level of such total rates in existence on June 30, 2007.
D. In proceedings under subsections A and C initiated prior to July 1, 2010, or initiated on or after July 1, 2010, for any electric utility that purchases fuel for the generation of electricity and that was, as of July 1, 1999, bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002:
1. Energy revenues associated with off-system sales of power shall be credited against fuel factor expenses in an amount equal to the total incremental fuel factor costs incurred in the production and delivery of such sales. In addition, 75 percent of the total annual margins from off-system sales shall be credited against fuel factor expenses; however, the Commission, upon application and after notice and opportunity for hearing, may require that a smaller percentage of such margins be so credited if it finds by clear and convincing evidence that such requirement is in the public interest. The remaining margins from off-system sales shall not be considered in the biennial reviews of electric utilities conducted pursuant to § 56-585.1. In the event such margins result in a net loss to the electric utility, (i) no charges shall be applied to fuel factor expenses and (ii) any such net losses shall not be considered in the biennial reviews of electric utilities conducted pursuant to § 56-585.1. For purposes of this subsection, "margins from off-system sales" shall mean the total revenues received from off-system sales transactions less the total incremental costs incurred; and
2. The Commission shall disallow recovery of any fuel costs that it finds without just cause to be the result of failure of the utility to make every reasonable effort to minimize fuel costs or any decision of the utility resulting in unreasonable fuel costs, giving due regard to reliability of service and the need to maintain reliable sources of supply, economical generation mix, generating experience of comparable facilities, and minimization of the total cost of providing service.
E. In proceedings under subsections A and C initiated on or after July 1, 2010, for any electric utility that purchases fuel for the generation of electricity and that was, as of July 1, 1999, bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002:
1. Energy revenues associated with off-system sales of power shall be credited against fuel factor expenses in such manner and in such amount as the Commission finds is in the public interest. In addition, such portion of the total annual margins from off-system sales that the Commission finds is in the public interest shall be credited against fuel factor expense. In the event such margins result in a net loss to the electric utility, the Commission may elect, if doing so is found to be in the public interest, (i) not to apply such charges to fuel factor expenses or (ii) not to consider any such net losses in rate case proceedings. For purposes of this subsection, "margins from off-system sales" shall mean the total revenues received from off-system sales transactions less the total incremental costs incurred; and
2. The Commission shall disallow recovery of any fuel costs that it finds without just cause to be the result of failure of the utility to make every reasonable effort to minimize fuel costs or any decision of the utility resulting in unreasonable fuel costs, giving due regard to reliability of service and the need to maintain reliable sources of supply, economical generation mix, generating experience of comparable facilities, and minimization of the total cost of providing service.
F. The Commission is authorized to promulgate, in accordance with the provisions of this section, all rules and regulations necessary to allow the recovery by electric utilities of all of their prudently incurred fuel costs under subsections A and C, including the cost of purchased power, as precisely and promptly as possible, with no over-recovery or under-recovery, except as provided in subsection C, in a manner that will tend to assure public confidence and minimize abrupt changes in charges to consumers.
G. The Commission may, however, dispense with the procedures set forth above for any electric utility that purchases fuel for the generation of electricity and that was, as of July 1, 1999, bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, if it finds, after notice and hearing, that the electric utility's fuel costs can be reasonably recovered through the rates and charges investigated and established in accordance with other sections of this chapter.
§ 56-577. Schedule for transition to retail competition; Commission authority; exemptions; pilot programs.
A. Retail competition for the purchase and sale of electric energy shall be subject to the following provisions:
1. Each incumbent electric utility owning, operating, controlling, or having an entitlement to transmission capacity shall join or establish a regional transmission entity, which entity may be an independent system operator, to which such utility shall transfer the management and control of its transmission system, subject to the provisions of § 56-579.
2. The generation of electric energy shall be subject to regulation as specified in this chapter.
3. From January 1, 2004, until the expiration or termination of capped rates, all retail customers of electric energy within the Commonwealth, regardless of customer class, shall be permitted to purchase electric energy from any supplier of electric energy licensed to sell retail electric energy within the Commonwealth. After the expiration or termination of capped rates, and subject to the provisions of subdivisions 4 and 5, only individual retail customers of electric energy within the Commonwealth, regardless of customer class, whose demand during the most recent calendar year exceeded five megawatts but did not exceed one percent of the customer's incumbent electric utility's peak load during the most recent calendar year unless such customer had noncoincident peak demand in excess of 90 megawatts in calendar year 2006 or any year thereafter, shall be permitted to purchase electric energy from any supplier of electric energy licensed to sell retail electric energy within the Commonwealth, except for any incumbent electric utility other than the incumbent electric utility serving the exclusive service territory in which such a customer is located, subject to the following conditions:
a. If such customer does not purchase electric energy from licensed suppliers after that date, such customer shall purchase electric energy from its incumbent electric utility.
b. Except as provided in subdivision 4, the demands of individual retail customers may not be aggregated or combined for the purpose of meeting the demand limitations of this provision, any other provision of this chapter to the contrary notwithstanding. For the purposes of this section, each noncontiguous site will nevertheless constitute an individual retail customer even though one or more such sites may be under common ownership of a single person.
c. If such customer does purchase electric energy from licensed suppliers after the expiration or termination of capped rates, it shall not thereafter be entitled to purchase electric energy from the incumbent electric utility without giving five years' advance written notice of such intention to such utility, except where such customer demonstrates to the Commission, after notice and opportunity for hearing, through clear and convincing evidence that its supplier has failed to perform, or has anticipatorily breached its duty to perform, or otherwise is about to fail to perform, through no fault of the customer, and that such customer is unable to obtain service at reasonable rates from an alternative supplier. If, as a result of such proceeding, the Commission finds it in the public interest to grant an exemption from the five-year notice requirement, such customer may thereafter purchase electric energy at the costs of such utility, as determined by the Commission pursuant to subdivision 3 d hereof, for the remainder of the five-year notice period, after which point the customer may purchase electric energy from the utility under rates, terms and conditions determined pursuant to § 56-585.1 if the utility, as of July 1, 1999, was bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, or under the provisions of Chapter 10 (§ 56-232 et seq.) of this title if the utility, as of July 1, 1999, was not bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002. However, such customer shall be allowed to individually purchase electric energy from the utility under rates, terms, and conditions determined pursuant to § 56-585.1 if the utility, as of July 1, 1999, was bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, or under the provisions of Chapter 10 (§ 56-232 et seq.) of this title if the utility, as of July 1, 1999, was not bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, if, upon application by such customer, the Commission finds that neither such customer's incumbent electric utility nor retail customers of such utility that do not choose to obtain electric energy from alternate suppliers will be adversely affected in a manner contrary to the public interest by granting such petition. In making such determination, the Commission shall take into consideration, without limitation, the impact and effect of any and all other previously approved petitions of like type with respect to such incumbent electric utility. Any customer that returns to purchase electric energy from its incumbent electric utility, before or after expiration of the five-year notice period, shall be subject to minimum stay periods equal to those prescribed by the Commission pursuant to subdivision C 1.
d. The costs of serving a customer that has received an exemption from the five-year notice requirement under subdivision 3 c hereof shall be the market-based costs of the utility, including (i) the actual expenses of procuring such electric energy from the market, (ii) additional administrative and transaction costs associated with procuring such energy, including, but not limited to, costs of transmission, transmission line losses, and ancillary services, and (iii) a reasonable margin as determined pursuant to the provisions of subdivision A 2 of § 56-585.1 if the utility, as of July 1, 1999, was bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, or pursuant to the provisions of Chapter 10 (§ 56-232 et seq.) of this title if the utility, as of July 1, 1999, was not bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002. The methodology established by the Commission for determining such costs shall ensure that neither utilities nor other retail customers are adversely affected in a manner contrary to the public interest.
4. After the expiration or termination of capped rates, two or more individual nonresidential retail customers of electric energy within the Commonwealth, whose individual demand during the most recent calendar year did not exceed five megawatts, may petition the Commission for permission to aggregate or combine their demands, for the purpose of meeting the demand limitations of subdivision 3, so as to become qualified to purchase electric energy from any supplier of electric energy licensed to sell retail electric energy within the Commonwealth under the conditions specified in subdivision 3. The Commission may, after notice and opportunity for hearing, approve such petition if it finds that:
a. Neither such customers' incumbent electric utility nor retail customers of such utility that do not choose to obtain electric energy from alternate suppliers will be adversely affected in a manner contrary to the public interest by granting such petition. In making such determination, the Commission shall take into consideration, without limitation, the impact and effect of any and all other previously approved petitions of like type with respect to such incumbent electric utility; and
b. Approval of such petition is consistent with the public interest.
If such petition is approved, all customers whose load has been aggregated or combined shall thereafter be subject in all respects to the provisions of subdivision 3 and shall be treated as a single, individual customer for the purposes of said subdivision. In addition, the Commission shall impose reasonable periodic monitoring and reporting obligations on such customers to demonstrate that they continue, as a group, to meet the demand limitations of subdivision 3. If the Commission finds, after notice and opportunity for hearing, that such group of customers no longer meets the above demand limitations, the Commission may revoke its previous approval of the petition, or take such other actions as may be consistent with the public interest.
5. After the expiration or termination of capped rates, individual retail customers of electric energy within the Commonwealth, regardless of customer class, shall be permitted to purchase electric energy provided 100 percent from renewable energy from any supplier of electric energy licensed to sell retail electric energy within the Commonwealth, except for any incumbent electric utility other than the incumbent electric utility serving the exclusive service territory in which such a customer is located, if the incumbent electric utility serving the exclusive service territory does not offer an approved tariff for electric energy provided 100 percent from renewable energy.
B. The Commission shall promulgate such rules and regulations as may be necessary to implement the provisions of this section.
C. 1. By January 1, 2002, the Commission shall promulgate regulations establishing whether and, if so, for what minimum periods, customers who request service from an incumbent electric utility pursuant to subsection D of § 56-582 or a default service provider, after a period of receiving service from other suppliers of electric energy, shall be required to use such service from such incumbent electric utility or default service provider, as determined to be in the public interest by the Commission.
2. Subject to (i) the availability of capped rate service under § 56-582, and (ii) the transfer of the management and control of an incumbent electric utility's transmission assets to a regional transmission entity after approval of such transfer by the Commission under § 56-579, retail customers of such utility (a) purchasing such energy from licensed suppliers and (b) otherwise subject to minimum stay periods prescribed by the Commission pursuant to subdivision 1, shall nevertheless be exempt from any such minimum stay obligations by agreeing to purchase electric energy at the market-based costs of such utility or default providers after a period of obtaining electric energy from another supplier. Such costs shall include (i) the actual expenses of procuring such electric energy from the market, (ii) additional administrative and transaction costs associated with procuring such energy, including, but not limited to, costs of transmission, transmission line losses, and ancillary services, and (iii) a reasonable margin. The methodology of ascertaining such costs shall be determined and approved by the Commission after notice and opportunity for hearing and after review of any plan filed by such utility to procure electric energy to serve such customers. The methodology established by the Commission for determining such costs shall be consistent with the goals of (a) promoting the development of effective competition and economic development within the Commonwealth as provided in subsection A of § 56-596, and (b) ensuring that neither incumbent utilities nor retail customers that do not choose to obtain electric energy from alternate suppliers are adversely affected.
3. Notwithstanding the provisions of subsection D of § 56-582 and subsection C of § 56-585, however, any such customers exempted from any applicable minimum stay periods as provided in subdivision 2 shall not be entitled to purchase retail electric energy thereafter from their incumbent electric utilities, or from any distributor required to provide default service under subsection B of § 56-585, at the capped rates established under § 56-582, unless such customers agree to satisfy any minimum stay period then applicable while obtaining retail electric energy at capped rates.
4. The Commission shall promulgate such rules and regulations as may be necessary to implement the provisions of this subsection, which rules and regulations shall include provisions specifying the commencement date of such minimum stay exemption program.
§ 56-580. Transmission and distribution of electric energy.
A. Subject to the provisions of § 56-585.1 with respect to any electric utility that as of July 1, 1999, was bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, the Commission shall continue to regulate pursuant to this title the distribution of retail electric energy to retail customers in the Commonwealth and, to the extent not prohibited by federal law, the transmission of electric energy in the Commonwealth.
B. The Commission shall continue to regulate, to the extent not prohibited by federal law, the reliability, quality and maintenance by transmitters and distributors of their transmission and retail distribution systems.
C. The Commission shall develop codes of conduct governing the conduct of incumbent electric utilities and affiliates thereof when any such affiliates provide, or control any entity that provides, generation, distribution, or transmission services, to the extent necessary to prevent impairment of competition. Nothing in this chapter shall prevent an incumbent electric utility from offering metering options to its customers.
D. The Commission shall permit the construction and operation of electrical generating facilities in Virginia upon a finding that such generating facility and associated facilities (i) will have no material adverse effect upon reliability of electric service provided by any regulated public utility, (ii) are required by the public convenience and necessity, if a petition for such permit is filed after July 1, 2007, and if they are to be constructed and operated by any regulated utility whose rates are regulated pursuant to § 56-585.1, and (iii) are not otherwise contrary to the public interest. In review of a petition for a certificate to construct and operate a generating facility described in this subsection, the Commission shall give consideration to the effect of the facility and associated facilities on the environment and establish such conditions as may be desirable or necessary to minimize adverse environmental impact as provided in § 56-46.1, unless exempt as a small renewable energy project for which the Department of Environmental Quality has issued a permit by rule pursuant to Article 5 (§ 10.1-1197.5 et seq.) of Chapter 11.1 of Title 10.1. In order to avoid duplication of governmental activities, any valid permit or approval required for an electric generating plant and associated facilities issued or granted by a federal, state or local governmental entity charged by law with responsibility for issuing permits or approvals regulating environmental impact and mitigation of adverse environmental impact or for other specific public interest issues such as building codes, transportation plans, and public safety, whether such permit or approval is prior to or after the Commission's decision, shall be deemed to satisfy the requirements of this section with respect to all matters that (i) are governed by the permit or approval or (ii) are within the authority of, and were considered by, the governmental entity in issuing such permit or approval, and the Commission shall impose no additional conditions with respect to such matters. Nothing in this section shall affect the ability of the Commission to keep the record of a case open. Nothing in this section shall affect any right to appeal such permits or approvals in accordance with applicable law. In the case of a proposed facility located in a region that was designated as of July 1, 2001, as serious nonattainment for the one-hour ozone standard as set forth in the federal Clean Air Act, the Commission shall not issue a decision approving such proposed facility that is conditioned upon issuance of any environmental permit or approval. The Commission shall complete any proceeding under this section, or under any provision of the Utility Facilities Act (§ 56-265.1 et seq.), involving an application for a certificate, permit, or approval required for the construction or operation by a public utility of a small renewable energy project as defined in § 10.1-1197.5, within nine months following the utility's submission of a complete application therefore. Small renewable energy projects as defined in § 10.1-1197.5 are in the public interest and in determining whether to approve such project, the Commission shall liberally construe the provisions of this title.
E. Nothing in this section shall impair the distribution service territorial rights of incumbent electric utilities, and incumbent electric utilities shall continue to provide distribution services within their exclusive service territories as established by the Commission. Subject to the provisions of § 56-585.1 with respect to any electric utility that as of July 1, 1999, was bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, the Commission shall continue to exercise its existing authority over the provision of electric distribution services to retail customers in the Commonwealth including, but not limited to, the authority contained in Chapters 10 (§ 56-232 et seq.) and 10.1 (§ 56-265.1 et seq.) of this title.
F. Nothing in this chapter shall impair the exclusive territorial rights of an electric utility owned or operated by a municipality as of July 1, 1999, or by an authority created by a governmental unit exempt from the referendum requirement of § 15.2-5403. Nor shall any provision of this chapter apply to any such electric utility unless (i) that municipality or that authority created by a governmental unit exempt from the referendum requirement of § 15.2-5403 elects to have this chapter apply to that utility or (ii) that utility, directly or indirectly, sells, offers to sell or seeks to sell electric energy to any retail customer eligible to purchase electric energy from any supplier in accordance with § 56-577 if that retail customer is outside the geographic area that was served by such municipality as of July 1, 1999, except (a) any area within the municipality that was served by an incumbent public utility as of that date but was thereafter served by an electric utility owned or operated by a municipality or by an authority created by a governmental unit exempt from the referendum requirement of § 15.2-5403 pursuant to the terms of a franchise agreement between the municipality and the incumbent public utility, or (b) where the geographic area served by an electric utility owned or operated by a municipality is changed pursuant to mutual agreement between the municipality and the affected incumbent public utility in accordance with § 56-265.4:1. If an electric utility owned or operated by a municipality as of July 1, 1999, or by an authority created by a governmental unit exempt from the referendum requirement of § 15.2-5403 is made subject to the provisions of this chapter pursuant to clause (i) or (ii) of this subsection, then in such event the provisions of this chapter applicable to incumbent electric utilities shall also apply to any such utility, mutatis mutandis.
G. The applicability of all provisions of this chapter except § 56-594 to any investor-owned incumbent electric utility supplying electric service to retail customers on January 1, 2003, whose service territory assigned to it by the Commission is located entirely within Dickenson, Lee, Russell, Scott, and Wise Counties shall be suspended effective July 1, 2003, so long as such utility does not provide retail electric services in any other service territory in any jurisdiction to customers who have the right to receive retail electric energy from another supplier. During any such suspension period, the utility's rates shall be (i) its capped rates established pursuant to § 56-582 for the duration of the capped rate period established thereunder, and (ii) determined thereafter by the Commission on the basis of such utility's prudently incurred costs pursuant to Chapter 10 (§ 56-232 et seq.) of this title.
H. The expiration date of any certificates granted by the Commission pursuant to subsection D, for which applications were filed with the Commission prior to July 1, 2002, shall be extended for an additional two years from the expiration date that otherwise would apply.
§ 56-581. Regulation of rates subject to Commission's jurisdiction.
A. After the expiration or termination of capped rates, except as provided in § 56-585.1 with respect to any electric utility that as of July 1, 1999, was bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, the Commission shall regulate the rates of investor-owned incumbent electric utilities for the transmission of electric energy, to the extent not prohibited by federal law, and for the generation of electric energy and the distribution of electric energy to retail customers by any electric utility that as of July 1, 1999, was bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, pursuant to § 56-585.1 and by any electric utility that as of July 1, 1999, was not bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, pursuant to the provisions of Chapter 10 (§ 56-232 et seq.) of this title.
B. Beginning July 1, 1999, and thereafter, no cooperative that was a member of a power supply cooperative on January 1, 1999, shall be obligated to file any rate rider as a consequence of an increase or decrease in the rates, other than fuel costs, of its wholesale supplier, nor must any adjustment be made to such cooperative's rates as a consequence thereof.
C. Except for the provision of default services under § 56-585 or emergency services in § 56-586, nothing in this chapter shall authorize the Commission to regulate the rates or charges for electric service to the Commonwealth and its municipalities.
§ 56-585.1. Generation, distribution, and transmission rates for certain electric utilities.
A. During the first six months of 2009, the Commission shall,
after notice and opportunity for hearing, initiate proceedings to review the
rates, terms and conditions for the provision of generation, distribution and
transmission services of each investor-owned incumbent electric utility. Such
proceedings shall be governed by the provisions of Chapter 10 (§ 56-232 et
seq.) of this title, except as modified herein. In such proceedings the Commission
shall determine fair rates of return on common equity applicable to the
generation and distribution services of the utility. In so doing, the
Commission may use any methodology to determine such return it finds consistent
with the public interest, but such return shall not be set lower than the
average of the returns on common equity reported to the Securities and Exchange
Commission for the three most recent annual periods for which such data are
available by not less than a majority, selected by the Commission as specified
in subdivision 2 b, of other investor-owned electric utilities in the peer
group of the utility, nor shall the Commission set such return more than 300
basis points higher than such average. The peer group of the utility shall be
determined in the manner prescribed in subdivision 2 b. The Commission may
increase or decrease such combined rate of return by up to 100 basis points
based on the generating plant performance, customer service, and operating
efficiency of a utility, as compared to nationally recognized standards
determined by the Commission to be appropriate for such purposes. In such a
proceeding, the Commission shall determine the rates that the utility may
charge until such rates are adjusted. If the Commission finds that the
utility's combined rate of return on common equity is more than 50 basis points
below the combined rate of return as so determined, it shall be authorized to
order increases to the utility's rates necessary to provide the opportunity to
fully recover the costs of providing the utility's services and to earn not
less than such combined rate of return. If the Commission finds that the
utility's combined rate of return on common equity is more than 50 basis points
above the combined rate of return as so determined, it shall be authorized
either (i) to order reductions to the utility's rates it finds appropriate,
provided that the Commission may not order such rate reduction unless it finds
that the resulting rates will provide the utility with the opportunity to fully
recover its costs of providing its services and to earn not less than the fair
rates of return on common equity applicable to the generation and distribution
services; or (ii) direct that 60 percent of the amount of the utility's
earnings that were more than 50 basis points above the fair combined rate of
return for calendar year 2008 be credited to customers' bills, in which event
such credits shall be amortized over a period of six to 12 months, as
determined at the discretion of the Commission, following the effective date of
the Commission's order and be allocated among customer classes such that the
relationship between the specific customer class rates of return to the overall
target rate of return will have the same relationship as the last approved
allocation of revenues used to design base rates. Commencing in 2011, the
Commission, after notice and opportunity for hearing, shall conduct biennial
reviews of the rates, terms and conditions for the provision of generation,
distribution and transmission services by each investor-owned incumbent
electric utility, subject
to that
(i) as of July 1, 1999, was not bound by a rate case settlement adopted by the
Commission that extended in its application beyond January 1, 2002, as provided
in Chapter 10 (§ 56-232 et seq.) of this title,
and (ii) as of July 1, 1999, was bound by a rate case settlement adopted by the
Commission that extended in its application beyond January 1, 2002, in
accordance with the following provisions:
1. Rates, terms and conditions for each service shall be
reviewed separately on an unbundled basis, and such reviews shall be conducted
in a single, combined proceeding. The first such review shall utilize the two
successive 12-month test periods ending December 31, 2010. However, the
Commission may, in its discretion, elect to stagger its conduct its
biennial reviews of such utilities
by utilizing the two successive 12-month test periods ending December 31, 2010, for a Phase I Utility, and
utilizing the two successive 12-month test periods ending
December 31, 2011, for a Phase II
Utility, with subsequent proceedings utilizing the two
successive 12-month test periods ending December 31 immediately preceding the
year in which such proceeding is conducted. For
purposes of this section, a Phase I Utility is an investor-owned incumbent
electric utility that was, as of July 1, 1999, not bound by a rate case
settlement adopted by the Commission that extended in its application beyond
January 1, 2002, and a Phase II Utility is an investor-owned incumbent electric
utility that was bound by such a settlement.
2. Subject to the provisions of subdivision 6, fair rates of return on common equity applicable separately to the generation and distribution services of such utility, and for the two such services combined, shall be determined by the Commission during each such biennial review, as follows:
a. The Commission may use any methodology to determine such return it finds consistent with the public interest, but such return shall not be set lower than the average of the returns on common equity reported to the Securities and Exchange Commission for the three most recent annual periods for which such data are available by not less than a majority, selected by the Commission as specified in subdivision 2 b, of other investor-owned electric utilities in the peer group of the utility subject to such biennial review, nor shall the Commission set such return more than 300 basis points higher than such average.
b. In selecting such majority of peer group investor-owned electric utilities, the Commission shall first remove from such group the two utilities within such group that have the lowest reported returns of the group, as well as the two utilities within such group that have the highest reported returns of the group, and the Commission shall then select a majority of the utilities remaining in such peer group. In its final order regarding such biennial review, the Commission shall identify the utilities in such peer group it selected for the calculation of such limitation. For purposes of this subdivision, an investor-owned electric utility shall be deemed part of such peer group if (i) its principal operations are conducted in the southeastern United States east of the Mississippi River in either the states of West Virginia or Kentucky or in those states south of Virginia, excluding the state of Tennessee, (ii) it is a vertically-integrated electric utility providing generation, transmission and distribution services whose facilities and operations are subject to state public utility regulation in the state where its principal operations are conducted, (iii) it had a long-term bond rating assigned by Moody's Investors Service of at least Baa at the end of the most recent test period subject to such biennial review, and (iv) it is not an affiliate of the utility subject to such biennial review.
c. The Commission may increase or decrease such combined rate of return by up to 100 basis points based on the generating plant performance, customer service, and operating efficiency of a utility, as compared to nationally recognized standards determined by the Commission to be appropriate for such purposes, such action being referred to in this section as a Performance Incentive. If the Commission adopts such Performance Incentive, it shall remain in effect without change until the next biennial review for such utility is concluded and shall not be modified pursuant to any provision of the remainder of this subsection.
d. In any Current Proceeding, the Commission shall determine whether the Current Return has increased, on a percentage basis, above the Initial Return by more than the increase, expressed as a percentage, in the United States Average Consumer Price Index for all items, all urban consumers (CPI-U), as published by the Bureau of Labor Statistics of the United States Department of Labor, since the date on which the Commission determined the Initial Return. If so, the Commission may conduct an additional analysis of whether it is in the public interest to utilize such Current Return for the Current Proceeding then pending. A finding of whether the Current Return justifies such additional analysis shall be made without regard to any Performance Incentive adopted by the Commission, or any enhanced rate of return on common equity awarded pursuant to the provisions of subdivision 6. Such additional analysis shall include, but not be limited to, a consideration of overall economic conditions, the level of interest rates and cost of capital with respect to business and industry, in general, as well as electric utilities, the current level of inflation and the utility's cost of goods and services, the effect on the utility's ability to provide adequate service and to attract capital if less than the Current Return were utilized for the Current Proceeding then pending, and such other factors as the Commission may deem relevant. If, as a result of such analysis, the Commission finds that use of the Current Return for the Current Proceeding then pending would not be in the public interest, then the lower limit imposed by subdivision 2 a on the return to be determined by the Commission for such utility shall be calculated, for that Current Proceeding only, by increasing the Initial Return by a percentage at least equal to the increase, expressed as a percentage, in the United States Average Consumer Price Index for all items, all urban consumers (CPI-U), as published by the Bureau of Labor Statistics of the United States Department of Labor, since the date on which the Commission determined the Initial Return. For purposes of this subdivision:
"Current Proceeding" means any proceeding conducted under any provisions of this subsection that require or authorize the Commission to determine a fair combined rate of return on common equity for a utility and that will be concluded after the date on which the Commission determined the Initial Return for such utility.
"Current Return" means the minimum fair combined rate of return on common equity required for any Current Proceeding by the limitation regarding a utility's peer group specified in subdivision 2 a.
"Initial Return" means the fair combined rate of return on common equity determined for such utility by the Commission on the first occasion after July 1, 2009, under any provision of this subsection pursuant to the provisions of subdivision 2 a.
e. In addition to other considerations, in setting the return on equity within the range allowed by this section, the Commission shall strive to maintain costs of retail electric energy that are cost competitive with costs of retail electric energy provided by the other peer group investor-owned electric utilities.
f. The determination of such returns, including the determination of whether to adopt a Performance Incentive and the amount thereof, shall be made by the Commission on a stand-alone basis, and specifically without regard to any return on common equity or other matters determined with regard to facilities described in subdivision 6.
g. If the combined rate of return on common equity earned by both the generation and distribution services is no more than 50 basis points above or below the return as so determined, such combined return shall not be considered either excessive or insufficient, respectively.
h. Any amount of a utility's earnings directed by the Commission to be credited to customers' bills pursuant to this section shall not be considered for the purpose of determining the utility's earnings in any subsequent biennial review.
3. Each such utility shall make a biennial filing by March 31
of every other year, beginning in 2011 2012, consisting of the
schedules contained in the Commission's rules governing utility rate increase
applications (20 VAC 5-200-30);
however, if the Commission elects to stagger the dates of the biennial reviews
of utilities as provided in subdivision 1, then Phase I utilities shall
commence biennial filings in 2011 and Phase II utilities shall commence
biennial filings in 2012. Such filing shall encompass the
two successive 12-month test periods ending December 31 immediately preceding
the year in which such proceeding is conducted, and in every such case the
filing for each year shall be identified separately and shall be segregated
from any other year encompassed by the filing. If the Commission determines
that rates should be revised or credits be applied to customers' bills pursuant
to subdivision 8 or 9, any rate adjustment clauses previously implemented
pursuant to subdivision 4 or 5 or those related to facilities utilizing
simple-cycle combustion turbines described in subdivision 6, shall be combined
with the utility's costs, revenues and investments until the amounts that are
the subject of such rate adjustment clauses are fully recovered. The Commission
shall combine such clauses with the utility's costs, revenues and investments
only after it makes its initial determination with regard to necessary rate
revisions or credits to customers' bills, and the amounts thereof, but after
such clauses are combined as herein specified, they shall thereafter be
considered part of the utility's costs, revenues, and investments for the
purposes of future biennial review proceedings.
4. The following costs incurred by the utility shall be deemed reasonable and prudent: (i) costs for transmission services provided to the utility by the regional transmission entity of which the utility is a member, as determined under applicable rates, terms and conditions approved by the Federal Energy Regulatory Commission and (ii) costs charged to the utility that are associated with demand response programs approved by the Federal Energy Regulatory Commission and administered by the regional transmission entity of which the utility is a member. Upon petition of a utility at any time after the expiration or termination of capped rates, but not more than once in any 12-month period, the Commission shall approve a rate adjustment clause under which such costs, including, without limitation, costs for transmission service, charges for new and existing transmission facilities, administrative charges, and ancillary service charges designed to recover transmission costs, shall be recovered on a timely and current basis from customers. Retail rates to recover these costs shall be designed using the appropriate billing determinants in the retail rate schedules.
5. A utility may at any time, after the expiration or termination of capped rates, but not more than once in any 12-month period, petition the Commission for approval of one or more rate adjustment clauses for the timely and current recovery from customers of the following costs:
a. Incremental costs described in clause (vi) of subsection B of § 56-582 incurred between July 1, 2004, and the expiration or termination of capped rates, if such utility is, as of July 1, 2007, deferring such costs consistent with an order of the Commission entered under clause (vi) of subsection B of § 56-582. The Commission shall approve such a petition allowing the recovery of such costs that comply with the requirements of clause (vi) of subsection B of § 56-582;
b. Projected and actual costs for the utility to design and operate fair and effective peak-shaving programs. The Commission shall approve such a petition if it finds that the program is in the public interest; provided that the Commission shall allow the recovery of such costs as it finds are reasonable;
c. Projected and actual costs for the utility to design, implement, and operate energy efficiency programs, including a margin to be recovered on operating expenses, which margin for the purposes of this section shall be equal to the general rate of return on common equity determined as described in subdivision A 2 of this section. The Commission shall only approve such a petition if it finds that the program is in the public interest. As part of such cost recovery, the Commission, if requested by the utility, shall allow for the recovery of revenue reductions related to energy efficiency programs. The Commission shall only allow such recovery to the extent that the Commission determines such revenue has not been recovered through margins from incremental off-system sales as defined in § 56-249.6 that are directly attributable to energy efficiency programs.
None of the costs of new energy efficiency programs of an electric utility, including recovery of revenue reductions, shall be assigned to any customer that has a verifiable history of having used more than 10 megawatts of demand from a single meter of delivery. Nor shall any of the costs of new energy efficiency programs of an electric utility, including recovery of revenue reductions, be incurred by any large general service customer as defined herein that has notified the utility of non-participation in such energy efficiency program or programs. A large general service customer is a customer that has a verifiable history of having used more than 500 kilowatts of demand from a single meter of delivery. Non-participation in energy efficiency programs shall be allowed by the Commission if the large general service customer has, at the customer's own expense, implemented energy efficiency programs that have produced or will produce measured and verified results consistent with industry standards and other regulatory criteria stated in this section. The Commission shall, no later than November 15, 2009, promulgate rules and regulations to accommodate the process under which such large general service customers shall file notice for such an exemption and (i) establish the administrative procedures by which eligible customers will notify the utility and (ii) define the standard criteria that must be satisfied by an applicant in order to notify the utility. In promulgating such rules and regulations, the Commission may also specify the timing as to when a utility shall accept and act on such notice, taking into consideration the utility's integrated resource planning process as well as its administration of energy efficiency programs that are approved for cost recovery by the Commission. The notice of non-participation by a large general service customer, to be given by March 1 of a given year, shall be for the duration of the service life of the customer's energy efficiency program. The Commission on its own motion may initiate steps necessary to verify such non-participants' achievement of energy efficiency if the Commission has a body of evidence that the non-participant has knowingly misrepresented its energy efficiency achievement. A utility shall not charge such large general service customer, as defined by the Commission, for the costs of installing energy efficiency equipment beyond what is required to provide electric service and meter such service on the customer's premises if the customer provides, at the customer's expense, equivalent energy efficiency equipment. In all relevant proceedings pursuant to this section, the Commission shall take into consideration the goals of economic development, energy efficiency and environmental protection in the Commonwealth;
d. Projected and actual costs of participation in a renewable energy portfolio standard program pursuant to § 56-585.2 that are not recoverable under subdivision 6. The Commission shall approve such a petition allowing the recovery of such costs as are provided for in a program approved pursuant to § 56-585.2; and
e. Projected and actual costs of projects that the Commission finds to be necessary to comply with state or federal environmental laws or regulations applicable to generation facilities used to serve the utility's native load obligations. The Commission shall approve such a petition if it finds that such costs are necessary to comply with such environmental laws or regulations. If the Commission determines it would be just, reasonable, and in the public interest, the Commission may include the enhanced rate of return on common equity prescribed in subdivision 6 in a rate adjustment clause approved hereunder for a project whose purpose is to reduce the need for construction of new generation facilities by enabling the continued operation of existing generation facilities. In the event the Commission includes such enhanced return in such rate adjustment clause, the project that is the subject of such clause shall be treated as a facility described in subdivision 6 for the purposes of this section.
The Commission shall have the authority to determine the duration or amortization period for any adjustment clause approved under this subdivision.
6. To ensure a reliable and adequate supply of electricity, to meet the utility's projected native load obligations and to promote economic development, a utility may at any time, after the expiration or termination of capped rates, petition the Commission for approval of a rate adjustment clause for recovery on a timely and current basis from customers of the costs of (i) a coal-fueled generation f