Electric transmission line verification costs; applicant to pay SCC or third-party consultant. (HB668)
Introduced By
Progress
✓ |
Introduced |
✗ |
Passed Committee |
☐ |
Passed House |
☐ |
Passed Senate |
☐ |
Signed by Governor |
☐ |
Became Law |
Description
State Corporation Commission; electric transmission line verification costs. Requires the applicant seeking approval of an electrical transmission line of 138 kilovolts or more to pay all costs associated with the required verification of the applicant's load flow modeling, contingency analyses, and reliability needs. The requirement applies whether verification is conducted by the Commission or by a third-party consultant selected by the Commission. Read the Bill »
Outcome
Bill Has Failed
History
Date | Action |
---|---|
01/12/2010 | Committee |
01/12/2010 | Prefiled and ordered printed; offered 01/13/10 10101291D |
01/12/2010 | Referred to Committee on Commerce and Labor |
01/17/2010 | Impact statement from SCC (HB668) |
02/04/2010 | Stricken from docket by Commerce and Labor |