SB535: Capital outlay plan; projects to be funded from general fund-supported resources.
Be it enacted by the General Assembly of Virginia:
1. § 1. That the following capital outlay projects and descriptive information shall constitute the Commonwealth's capital outlay plan, pursuant to § 2.2-1518 of the Code of Virginia, for the capital projects supported entirely or partially from the general fund for the six-year period beginning July 1, 2012.
Agency Number
Agency Name
Project Name
Agency Priority
Category
146
Science Museum of Virginia
SMV - Museum Exhibits & Special Events Space
1
$10,000,001 to $25,000,000
146
Science Museum of Virginia
SMV - Convert Special Events Tent into Permanent Structure
2
$0 to $10,000,000
146
Science Museum of Virginia
SMV - Convert Imax Dome to Full Dome Digital Projection System
3
$0 to $10,000,000
146
Science Museum of Virginia
SMV - Danville Science Center: Building, Site, Exhibit Improvements
4
$0 to $10,000,000
194
Department of General Services
DGS - Monroe Exterior Repairs and Jefferson Building Window Replacement
2
$0 to $10,000,000
194
Department of General Services
DGS - DCLS Critical Repairs and Improvements
5
$0 to $10,000,000
194
Department of General Services
DGS - Capital Projects Space Improvement Budget - Dept of Conservation and Recreation
7
$0 to $10,000,000
194
Department of General Services
DGS - Morson Row Renovation
9
$0 to $10,000,000
194
Department of General Services
DGS - Main Street Centre Renovation
10
$0 to $10,000,000
194
Department of General Services
DGS - Pocahontas Building Renovation
11
$0 to $10,000,000
194
Department of General Services
DGS - Monroe Building Interior Renovation
12
$10,000,001 to $25,000,000
194
Department of General Services
DGS - Security Enhancement Project
13
$0 to $10,000,000
194
Department of General Services
DGS - Zincke and Aluminum Buildings Demolition and Site Stabilization
14
$0 to $10,000,000
199
Department of Conservation and Recreation
DCR - Construct Phase I Development & Campground, Widewater State Park
1
$10,000,001 to $25,000,000
199
Department of Conservation and Recreation
DCR - Complete Cabin Complexes, Multiple State Parks
2
$10,000,001 to $25,000,000
199
Department of Conservation and Recreation
DCR - Repairs and Upgrades to State Park Owned Dams
3
$0 to $10,000,000
199
Department of Conservation and Recreation
DCR - Construct On-Site Residences, Various State Parks
4
$10,000,001 to $25,000,000
199
Department of Conservation and Recreation
DCR - Complete Phase I Development, Powhatan State Park
5
$0 to $10,000,000
199
Department of Conservation and Recreation
DCR - Natural Area Access Improvements
6
$0 to $10,000,000
199
Department of Conservation and Recreation
DCR - Construct Visitor Centers at Douthat, Kiptopeke & High Bridge State Parks
7
$0 to $10,000,000
199
Department of Conservation and Recreation
DCR - Construct Visitor Centers at Twin Lakes, Sky Meadows & Fairy Stone State Parks
8
$0 to $10,000,000
199
Department of Conservation and Recreation
DCR - Renovate/Upgrade Visitor Centers, York River and Chippokes State Parks
9
$0 to $10,000,000
199
Department of Conservation and Recreation
DCR - Develop Infrastructure, New River Trail State Park
10
$10,000,001 to $25,000,000
199
Department of Conservation and Recreation
DCR - Dredge Boat Ramp and Repair Shoreline Erosion, Belle Isle State Park
11
$0 to $10,000,000
203
Woodrow Wilson Rehabilitation Center
WWRC - Roof Replacement - Birdsall-Hoover Medical Administration Building 806
1
$0 to $10,000,000
203
Woodrow Wilson Rehabilitation Center
WWRC - Life Safety Improvements, Anderson Vocational Training Building #803, Phase 1 of 2
2
$0 to $10,000,000
203
Woodrow Wilson Rehabilitation Center
WWRC - Renovate Harold E. Watson Dining Hall and Activities Building 802, Phase 2 of 2
3
$0 to $10,000,000
204
College of William and Mary
CWM - Construct Cooling Plant and Replace Utilities, Phase IV
1
$0 to $10,000,000
204
College of William and Mary
CWM - Improve Lake Matoaka Dam Spillway
2
$0 to $10,000,000
204
College of William and Mary
CWM - Improve Campus Storm Water Infrastructure
4
$0 to $10,000,000
204
College of William and Mary
CWM - Renovate Old Campus (Tyler Hall & Brafferton)
5
$10,000,001 to $25,000,000
204
College of William and Mary
CWM - Design: Arts Complex, Phase I
6
$0 to $10,000,000
207
University of Virginia
UVA - Renovate the Rotunda
1
$25,000,001 to $50,000,000
207
University of Virginia
UVA - Construct Ivy Foundation Translational Research Building
2
$50,000,001 to $75,000,000
207
University of Virginia
UVA - Replace North Grounds Boiler and Chiller Plant
3
$10,000,001 to $25,000,000
207
University of Virginia
UVA - Renovate Gilmer Hall and Chemistry Building
4
Above $100,000,000
207
University of Virginia
UVA - Replace Alderman and Clemons Chillers
5
$10,000,001 to $25,000,000
208
Virginia Tech
VT - Construct Classroom Building
1
$25,000,001 to $50,000,000
208
Virginia Tech
VT - Renovate / Renew Academic Buildings
2
$25,000,001 to $50,000,000
208
Virginia Tech
VT - Construct Translational Medicine Laboratory
3
Above $100,000,000
208
Virginia Tech
VT - Construct Chiller Plant, Phase II
4
$10,000,001 to $25,000,000
208
Virginia Tech
VT - Construct Engineering and Computational Sciences Research Facility
5
$50,000,001 to $75,000,000
208
Virginia Tech
VT - Renovate Derring Hall, Phase I
6
$25,000,001 to $50,000,000
208
Virginia Tech
VT - Renovate Lane Hall and Construct Addition
7
$25,000,001 to $50,000,000
208
Virginia Tech
VT - Construct Library Collections Facility
8
$0 to $10,000,000
208
Virginia Tech
VT - Renovate Randolph Hall
9
Above $100,000,000
208
Virginia Tech
VT - Renovate Robeson Hall
10
$50,000,001 to $75,000,000
208
Virginia Tech
VT - Construct Vivarium and Research Laboratory
11
$25,000,001 to $50,000,000
208
Virginia Tech
VT - Address Fire Alarm Systems and Access
12
$10,000,001 to $25,000,000
211
Virginia Military Institute
Corps Physical Training Facilities - Phase I
1
$75,000,001 to $100,000,000
211
Virginia Military Institute
Corps Physical Training Facilities - Phase II
2
$10,000,001 to $25,000,000
211
Virginia Military Institute
VMI - Improve Post Infrastructure Phase I
3
$10,000,001 to $25,000,000
211
Virginia Military Institute
VMI - Renovate Preston Library
4
$10,000,001 to $25,000,000
211
Virginia Military Institute
VMI - Renovate Moody Hall
5
$10,000,001 to $25,000,000
211
Virginia Military Institute
VMI - Renovate Old Hospital
6
$0 to $10,000,000
211
Virginia Military Institute
VMI - New Market Battlefield Historic Park Improvements
7
$0 to $10,000,000
211
Virginia Military Institute
VMI - Renovate Cameron Hall
8
$25,000,001 to $50,000,000
211
Virginia Military Institute
VMI - Historic Preservation Improvements, Phase I
9
$0 to $10,000,000
211
Virginia Military Institute
VMI - Renovate Carroll Hall
10
$10,000,001 to $25,000,000
212
Virginia State University
VSU - Renovate Hunter McDaniel Hall (Equipment)
1
$0 to $10,000,000
212
Virginia State University
VSU - Life safety Site Mechanical Renewal and Replacements
2
$25,000,001 to $50,000,000
212
Virginia State University
VSU - Renovate Harris Hall
3
$25,000,001 to $50,000,000
212
Virginia State University
VSU - Renovate Lockett Hall
4
$10,000,001 to $25,000,000
212
Virginia State University
VSU - Renovate And Expand Daniel Gym
5
$25,000,001 to $50,000,000
213
Norfolk State University
NSU - Renovate and Modify Brown Hall
1
$50,000,001 to $75,000,000
213
Norfolk State University
NSU - Construct New Science Building
2
$50,000,001 to $75,000,000
213
Norfolk State University
NSU - Renovate and Expand Hamm Fine Arts Building
3
$25,000,001 to $50,000,000
214
Longwood University
LU - University Technology Center (Equipment)
1
$0 to $10,000,000
214
Longwood University
LU - Replace Willett Hall HVAC
2
$0 to $10,000,000
214
Longwood University
LU - Add Third Biomass Boiler
3
$0 to $10,000,000
214
Longwood University
LU - Construct Student Success Center
4
$10,000,001 to $25,000,000
214
Longwood University
LU - New Admissions Office Space
5
$0 to $10,000,000
214
Longwood University
LU - Physical Plant Office Space
8
$25,000,001 to $50,000,000
214
Longwood University
LU - Renovate South Ruffner for Faculty Offices
9
$0 to $10,000,000
214
Longwood University
LU - Renovate Heating Plant Facility
14
$10,000,001 to $25,000,000
215
University of Mary Washington
UMW - Renovation of Mercer and Woodward Halls
1
$10,000,001 to $25,000,000
215
University of Mary Washington
UMW - Construct Jepson Science Center Addition
2
$10,000,001 to $25,000,000
215
University of Mary Washington
UMW - Repair/Replace Underground Utilities
3
$0 to $10,000,000
215
University of Mary Washington
UMW - Improve stormwater management
4
$0 to $10,000,000
215
University of Mary Washington
UMW - Install university card access system
5
$0 to $10,000,000
216
James Madison University
JMU - Health & Engineering Academic Facility (East Tower)
1
$50,000,001 to $75,000,000
216
James Madison University
JMU - Renovate Johnston Hall
2
$10,000,001 to $25,000,000
216
James Madison University
JMU - Jackson Hall Renovation
3
$0 to $10,000,000
216
James Madison University
JMU - Replace Boiler & Infrastructure - Phase 2
4
$0 to $10,000,000
216
James Madison University
JMU - Newman Lake Dam Repair
5
$0 to $10,000,000
217
Radford University
RU - Construct New Computational Sciences Building
1
$25,000,001 to $50,000,000
217
Radford University
RU - Construct New Academic Building, Phase I & II
2
$50,000,001 to $75,000,000
217
Radford University
RU - Renovate Curie Hall
3
$25,000,001 to $50,000,000
217
Radford University
RU - Whitt Hall Renovation
4
$0 to $10,000,000
218
Virginia School for the Deaf and the Blind
VSDB - Main Hall Renovation
1
$10,000,001 to $25,000,000
218
Virginia School for the Deaf and the Blind
VSDB - Install sprinklers in Byrd Hall
2
$0 to $10,000,000
218
Virginia School for the Deaf and the Blind
VSDB - Renovation - Bass Hall
3
$0 to $10,000,000
218
Virginia School for the Deaf and the Blind
VSDB - Repair Historical Features - Chapel
4
$0 to $10,000,000
218
Virginia School for the Deaf and the Blind
VSDB - Renovation - Lewellyn Gym
5
$0 to $10,000,000
218
Virginia School for the Deaf and the Blind
VSDB - Renovation - Bradford Hall
6
$0 to $10,000,000
221
Old Dominion University
ODU - New School of Education
1
$25,000,001 to $50,000,000
221
Old Dominion University
ODU - Construct a Joint Policing Facility
3
$10,000,001 to $25,000,000
221
Old Dominion University
ODU - Construct Consolidated Arts Complex
4
$0 to $10,000,000
221
Old Dominion University
ODU - Construct Systems Research & Academic Building (equipment)
6
$0 to $10,000,000
221
Old Dominion University
ODU -Renovate Spong and Rollins Hall
6
$10,000,001 to $25,000,000
221
Old Dominion University
ODU - Construct a Chemistry and Life Sciences Building
7
$50,000,001 to $75,000,000
221
Old Dominion University
ODU - Renovate the Godwin Life Sciences Building
8
$10,000,001 to $25,000,000
221
Old Dominion University
ODU -Construct Addition to Health Sciences Building
9
$10,000,001 to $25,000,000
229
Virginia Tech Cooperative Extension
VT/CE - Improve Kentland Facilities, Phase I
1
$10,000,001 to $25,000,000
229
Virginia Tech Cooperative Extension
VT/CE - Construct Animal Production Facility
2
$0 to $10,000,000
236
Virginia Commonwealth University
VCU - Construct and Renovate Information Commons and Libraries
1
$25,000,001 to $50,000,000
236
Virginia Commonwealth University
VCU - Renovate Sanger Hall, Phase II
2
$10,000,001 to $25,000,000
236
Virginia Commonwealth University
VCU - Renovate Student Services Building, MCV Campus
3
$10,000,001 to $25,000,000
236
Virginia Commonwealth University
VCU - Renovate Raleigh Building
4
$0 to $10,000,000
236
Virginia Commonwealth University
VCU - Construct School of Allied Health Professions Building
5
$25,000,001 to $50,000,000
236
Virginia Commonwealth University
VCU - School of Medicine Renovations I
6
$25,000,001 to $50,000,000
236
Virginia Commonwealth University
VCU - Renovate Oliver Hall
7
$25,000,001 to $50,000,000
236
Virginia Commonwealth University
VCU - Construct Basic and Life Sciences Building, Phase II
8
$25,000,001 to $50,000,000
238
Virginia Museum of Fine Arts
VMFA - Renovate Robinson House
1
$0 to $10,000,000
238
Virginia Museum of Fine Arts
VMFA - Replace roof 1985 addition
2
$0 to $10,000,000
239
Frontier Culture Museum
FCM - Replace Administrative Complex HVAC
1
$0 to $10,000,000
239
Frontier Culture Museum
FCM - Construct Early American Industry Exhibit
2
$0 to $10,000,000
239
Frontier Culture Museum
FCM - Construct Crossing Gallery
3
$10,000,001 to $25,000,000
241
Richard Bland College
RBC - Renovate Ernst Hall
1
$0 to $10,000,000
241
Richard Bland College
RBC - Umbrella Maintenance Project
2
$0 to $10,000,000
241
Richard Bland College
RBC - Renovation of Humanities and Social Sciences Building
3
$0 to $10,000,000
241
Richard Bland College
RBC - Construct Police Department/Technology Services Building
4
$0 to $10,000,000
242
Christopher Newport University
CNU - Construct Library Phase II
2
$25,000,001 to $50,000,000
242
Christopher Newport University
CNU - Construct Integrated Science Center, Phase III
3
$25,000,001 to $50,000,000
242
Christopher Newport University
CNU - Student Success Center
1
$25,000,001 to $50,000,000
242
Christopher Newport University
CNU - Renovate Fine Arts and Gallery Space
4
$0 to $10,000,000
246
University of Virginia at Wise
UVA Wise - Dam Safety Modifications
1
$0 to $10,000,000
246
University of Virginia at Wise
UVA Wise - Construct Proscenium Theatre Building
2
$25,000,001 to $50,000,000
247
George Mason University
GMU - Renovate Science & Technology Buildings I and II (equipment)
1
$0 to $10,000,000
247
George Mason University
GMU - Construct Academic VII/Research III, Phase I
2
$50,000,001 to $75,000,000
247
George Mason University
GMU - Renovate Robinson Hall and Harris Theater (Phased)
3
$50,000,001 to $75,000,000
247
George Mason University
GMU - Construct Bull Run Hall IIIB Addition
4
$50,000,001 to $75,000,000
247
George Mason University
GMU - Construct Facilities Complex, Fairfax Campus
5
$25,000,001 to $50,000,000
247
George Mason University
GMU - Improvements to Telecommunications Infrastructure
6
$0 to $10,000,000
247
George Mason University
GMU - Renovate Science & Tech I
7
$25,000,001 to $50,000,000
247
George Mason University
GMU - Renovate Campus Library Phase II
8
$25,000,001 to $50,000,000
260
Virginia Community College System
VCCS - Construct Higher Education Center, Loudoun Campus, Northern Virginia (equipment)
1
$0 to $10,000,000
260
Virginia Community College System
VCCS - Replace Tyler Academic Building, Northern Virginia Community College (equipment)
2
$0 to $10,000,000
260
Virginia Community College System
Expand Brault Building (equipment), Annandale, Northern Virginia
3
$0 to $10,000,000
260
Virginia Community College System
Construct Learning Resources Center (equipment), Daniel, Southside Virginia
4
$0 to $10,000,000
260
Virginia Community College System
Construct Workforce Training Center (equipment), Woodbridge, Northern Virginia
5
$0 to $10,000,000
260
Virginia Community College System
VCCS - Construct Academic Building CN6, Chesapeake Campus, Tidewater
6
$25,000,001 to $50,000,000
260
Virginia Community College System
VCCS - Construct Bioscience Building, Blue Ridge CC
7
$10,000,001 to $25,000,000
260
Virginia Community College System
VCCS - Construct New Classroom and Administration Building, Blue Ridge
8
$10,000,001 to $25,000,000
260
Virginia Community College System
VCCS - Construct Phase III Academic Building, Midlothian Campus, John Tyler
9
$25,000,001 to $50,000,000
260
Virginia Community College System
VCCS - Construct Phase VII Academic Building, Annandale Campus, Northern Virginia
10
$25,000,001 to $50,000,000
260
Virginia Community College System
VCCS - Renovate Bayside Building, Virginia Beach Campus, Tidewater
11
$10,000,001 to $25,000,000
260
Virginia Community College System
VCCS - Renovate Building B, Parham Road Campus, J. Sargeant Reynolds
12
$10,000,001 to $25,000,000
260
Virginia Community College System
VCCS - Renovate Engineering and Industrial Technology Building, Danville
13
$10,000,001 to $25,000,000
260
Virginia Community College System
VCCS - Renovate Phase I Academic and Administration Building, Eastern Shore
14
$10,000,001 to $25,000,000
260
Virginia Community College System
VCCS - Renovate Reynolds Academic Building, Loudoun Campus, Northern Virginia
15
$10,000,001 to $25,000,000
260
Virginia Community College System
VCCS - Construct Student Service and Learning Resources Center, Christianna Campus, Southside VA
16
$10,000,001 to $25,000,000
260
Virginia Community College System
Renovate Main Hall, Middletown, Lord Fairfax
17
$0 to $10,000,000
260
Virginia Community College System
VCCS - Renovate Anderson Hall, Virginia Western
19
$25,000,001 to $50,000,000
260
Virginia Community College System
Construct New Building for Trucking Program, Portsmouth, Tidewater
20
$10,000,001 to $25,000,000
260
Virginia Community College System
HVAC Improvements, Rappahannock
21
$0 to $10,000,000
260
Virginia Community College System
VCCS - Construct Science Building, Chester Campus, John Tyler
22
$25,000,001 to $50,000,000
260
Virginia Community College System
VCCS - Construct Academic Building, Middletown Campus, Lord Fairfax
23
$10,000,001 to $25,000,000
260
Virginia Community College System
VCCS - Construct Academic Health and Wellness Center, Hampton Campus, Thomas Nelson
24
$10,000,001 to $25,000,000
260
Virginia Community College System
VCCS - Renovate Library and Learning Resource Center, Virginia Highlands
26
$0 to $10,000,000
260
Virginia Community College System
VCCS - Renovate and Construct Addition to Workforce Development Center, Piedmont Virginia
27
$0 to $10,000,000
260
Virginia Community College System
Campus Renovations, Wytheville
28
$0 to $10,000,000
260
Virginia Community College System
Replace Exterior Windows and Doors, Rappahannock
29
$0 to $10,000,000
260
Virginia Community College System
Renovate Bird and Nicholas Hall, Chester, John Tyler
30
$10,000,001 to $25,000,000
260
Virginia Community College System
Construct Learning Resources Center, Chesapeake, Tidewater
31
$10,000,001 to $25,000,000
260
Virginia Community College System
Plaza Repairs, Annandale Campus, Northern Virginia
32
$0 to $10,000,000
260
Virginia Community College System
Construct Network Operations Center, Tidewater
33
$0 to $10,000,000
260
Virginia Community College System
Renovate Phase III Building, Loudoun, Northern Virginia
34
$10,000,001 to $25,000,000
260
Virginia Community College System
VCCS - Renovate Bisdorf Phase II Academic Building, Alexandria Campus, Northern Virginia
35
$10,000,001 to $25,000,000
260
Virginia Community College System
Construct Workforce Solutions & Academic Training Center, Fauquier, Lord Fairfax
36
$10,000,001 to $25,000,000
260
Virginia Community College System
Construct Canopies, Virginia Highland
37
$0 to $10,000,000
260
Virginia Community College System
VCCS - Renovate Stone Hall Building, Patrick Henry
38
$10,000,001 to $25,000,000
260
Virginia Community College System
Renovate Academic Classrooms & Admin Building, Rappahannock
39
$10,000,001 to $25,000,000
260
Virginia Community College System
VCCS - Renovate Seefeldt Academic Building, Woodbridge Campus, Northern Virginia
40
$25,000,001 to $50,000,000
260
Virginia Community College System
Relocate Observatory, Chesapeake, Tidewater
41
$0 to $10,000,000
260
Virginia Community College System
Renovate Academic Buildings, Tidewater
42
$0 to $10,000,000
260
Virginia Community College System
Construct Learning Resource Center, Patrick Henry
43
$0 to $10,000,000
260
Virginia Community College System
Renovate / Repair Exterior & Interior Structures, Thomas Nelson
44
$0 to $10,000,000
260
Virginia Community College System
Construct Maintenance Building, Germanna
45
$0 to $10,000,000
260
Virginia Community College System
Renovate & Expand Phase III Academic Building, Manassas, Northern Virginia
46
$25,000,001 to $50,000,000
268
Virginia Institute of Marine Sciences
VIMS - Construct Facilities Management Maintenance Facility
1
$0 to $10,000,000
268
Virginia Institute of Marine Sciences
VIMS - Construct a Consolidated Scientific Research Facility
2
$10,000,001 to $25,000,000
268
Virginia Institute of Marine Sciences
VIMS - Replace the Oyster Hatchery
3
$10,000,001 to $25,000,000
268
Virginia Institute of Marine Sciences
VIMS - Purchase a Research Vessel - Equipment
4
$0 to $10,000,000
310
Virginia Economic Development Partnership
VEDP - Construct Shell Buildings for Biosciences and Related Industries
n/a
$10,000,001 to $25,000,000
425
Jamestown-Yorktown Foundation
JYF - Construct Jamestown road wall & sound buffer
n/a
$0 to $10,000,000
425
Jamestown-Yorktown Foundation
JYF - Yorktown Outside Areas, Signage and Amenities
n/a
$0 to $10,000,000
720
Department of Behavioral Health and Developmental Services
DBHDS - Replace Facility Roofs and Building Envelopes
1
$10,000,001 to $25,000,000
720
Department of Behavioral Health and Developmental Services
DBHDS - Renovate main hospital building at Piedmont Geriatric Hospital
2
$25,000,001 to $50,000,000
720
Department of Behavioral Health and Developmental Services
DBHDS - Repair/Replace Campus Infrastructures, Phase 2
3
$10,000,001 to $25,000,000
720
Department of Behavioral Health and Developmental Services
DBHDS - Repair/Replace Boilers, Heat Distribution and HVAC Systems
4
$50,000,001 to $75,000,000
720
Department of Behavioral Health and Developmental Services
DBHDS - Replace Forensic Unit at Central State Hospital
6
$75,000,001 to $100,000,000
720
Department of Behavioral Health and Developmental Services
DBHDS - Replace Support Service Facility at Eastern State Hospital
7
$25,000,001 to $50,000,000
720
Department of Behavioral Health and Developmental Services
DBHDS - Renovate Building 96 at Central State Hospital
8
$0 to $10,000,000
720
Department of Behavioral Health and Developmental Services
DBHDS - Furniture, Fixture and Equipment for New Western State Hospital
9
$0 to $10,000,000
720
Department of Behavioral Health and Developmental Services
DBHDS - Abate Environmental Hazards
11
$0 to $10,000,000
777
Department of Juvenile Justice
DJJ - Upgrade Reception and Diagnostic Center (Infirmary and School)
1
$0 to $10,000,000
777
Department of Juvenile Justice
DJJ - Renovate Cedar Lodge and Replace the Modular Building
2
$0 to $10,000,000
777
Department of Juvenile Justice
DJJ - Hanover JCC: Renovate Gee Cottage Infirmary
3
$0 to $10,000,000
777
Department of Juvenile Justice
DJJ - Construct Building at Oak Ridge Juvenile Correctional Center
6
$10,000,001 to $25,000,000
777
Department of Juvenile Justice
DJJ - Construct School Addition -- Hanover Juvenile Correctional Center
7
$0 to $10,000,000
778
Department of Forensic Science
DFS - Expand Central Forensic Laboratory & Office of the Chief Medical Examiner Facility
1
$75,000,001 to $100,000,000
778
Department of Forensic Science
DFS - Expand Western Forensic Laboratory & Office of the Chief Medical Examiner Facility
2
$25,000,001 to $50,000,000
799
Department of Corrections
DOC - Shakedown Building -- James River WC
4
$0 to $10,000,000
799
Department of Corrections
DOC - P&P Office Building -- District #1
5
$0 to $10,000,000
799
Department of Corrections
DOC - Perimeter Security -- Multiple
7
$0 to $10,000,000
799
Department of Corrections
DOC - Security controls -- Sussex I & II
8
$0 to $10,000,000
799
Department of Corrections
DOC - Security/Detention -- Keen Mountain
10
$0 to $10,000,000
799
Department of Corrections
DOC - Security/Detention -- Marion
11
$10,000,001 to $25,000,000
799
Department of Corrections
DOC - Security/Detention -- Buckingham
12
$0 to $10,000,000
799
Department of Corrections
DOC - Security Detention -- Nottoway
13
$0 to $10,000,000
799
Department of Corrections
DOC - Security/Detention Augusta
14
$0 to $10,000,000
799
Department of Corrections
DOC - Windows -- VCCW
17
$10,000,001 to $25,000,000
799
Department of Corrections
DOC - Greensville - Upgrade Fire Alarm Systems (16426)
19
$0 to $10,000,000
799
Department of Corrections
DOC - Install Fire Safety Systems and Exits
19
$0 to $10,000,000
799
Department of Corrections
DOC - Water and Fire Pump Replacement
20
$0 to $10,000,000
799
Department of Corrections
DOC - WWTP - Buckingham
25
$0 to $10,000,000
799
Department of Corrections
DOC - WWTP - Caroline
26
$0 to $10,000,000
799
Department of Corrections
DOC - Construct Elevated Water Storage Tank at James River
27
$0 to $10,000,000
799
Department of Corrections
DOC - WWTP - Multiple
28
$0 to $10,000,000
799
Department of Corrections
DOC - WWTP Pretreatment - Multiple (Auger Monsters)
29
$0 to $10,000,000
799
Department of Corrections
DOC - HVAC -- Buckingham
30
$0 to $10,000,000
799
Department of Corrections
DOC - Emergency Generators -- Deep Meadow
32
$0 to $10,000,000
799
Department of Corrections
DOC - Upgrade Wastewater Treatment Plant at James River
36
$0 to $10,000,000
885
Institute for Advanced Learning and Research
IAL - Southern Virginia Bio Renewable Center
1
$10,000,001 to $25,000,000
912
Department of Veterans Services
DVS - Construct Veterans Care Center in Hampton Roads
1
Above $100,000,000
912
Department of Veterans Services
DVS - Virginia War Memorial/DVS Offices and Parking
2
$10,000,001 to $25,000,000
912
Department of Veterans Services
DVS - Construct Northern Virginia Veterans Care Center
3
Above $100,000,000
912
Department of Veterans Services
DVS - Install Generator, Salem Veterans Care Center
4
$0 to $10,000,000
935
Roanoke Higher Education Authority
RHEA - Repair Building Envelope to Stop and Remediate Water Intrusion
n/a
$0 to $10,000,000
948
Southwest Virginia Higher Education Center
SWVHEC - Construct Service Corridor and Storage Area
n/a
$0 to $10,000,000
2. That Chapter 46 of the Acts of Assembly of 2009 is repealed.
Be it enacted by the General Assembly of Virginia:
1. That Chapter 46 of the Acts of Assembly of 2009 is amended and reenacted as follows:
§ 1. That the following capital outlay projects and
descriptive information shall constitute the Commonwealth's capital outlay
plan, pursuant to § 2.2-1518 of the Code of Virginia, for the capital projects
supported entirely or partially from the general fund for the six-year period
beginning July 1, 2009 2012.
Agency or Institution
Project Title
Priority
Description
Christopher Newport University
Improve Student Security Infrastructure
4 5
Provides for the connection all of the buildings and open areas on campus through state-of-the-art technology and enables the university to perform needed upgrades to its computing infrastructure and to control access to buildings and computer systems.
Christopher Newport University
Renovate Band Rehearsal Hall and Connector
5 6
Supports the renovation of a 1950's high school gymnasium into a modern band rehearsal hall and completes the renovation of the area breezeway connecting this area to the front of the Center for the Arts.
Department of Conservation & Recreation
Construct On-Site Residences, Various State Parks
1 4
Provides 14 residences and 14 parks across the state. This will allow the agency to provide housing for on-sight law enforcement personnel.
Department of Conservation & Recreation
Dredge Boat Ramp and Repair Shoreline Erosion, Belle Isle State Park
3 11
Provides for dredging the boat ramp and the channel to the Rappahannock River. The project will also stabilize the park's shoreline to prevent further erosion.
Department of Conservation & Recreation
Construct Improvements at Natural Areas
5 7
Provides for public access, including parking lots, walkways, and signs at five to six of the major natural area sites.
Department of Conservation & Recreation
Acquire property for Mayo River State Park
6 12
Provides funding for acquisition of land for the park.
Department of Conservation & Recreation
Complete Phase I Development, Powhatan State Park
3
Completes the first phase of development at Powhatan State Park.
Department of Conservation & Recreation
Construct Visitor Centers at Douthat, Kiptopeke, and High Bridge State Parks
6
Constructs visitor centers at Douthat, Kiptopeke, and High Bridge State Parks.
Department of Conservation & Recreation
Construct Visitor Centers at Twin Lakes, Sky Meadows, and Fairy Stone State Parks
8
Constructs visitor centers at Twin Lakes, Sky Meadows, and Fairy Stone State Parks.
Department of Conservation & Recreation
Improve Access to Natural Areas
5
Improves public access to natural areas.
Department of Corrections
Construct 200 Bed Housing Unit at Bland
2 14
Provides for the removal of three existing modular housing structures, and one office trailer, and replacing them with more substantial and longer lasting housing units.
Department of Corrections
Upgrade Perimeter Detection System (Multiple Institutions)
3 13
Upgrades electronic detection systems on perimeter fences.
Department of Corrections
Replace Door Control Systems
6 10
Provides supplemental funding for an existing umbrella project created to replace obsolete door control panels and systems.
Department of Corrections
Upgrade Building Electrical Service Entrance--Augusta
7 16
Upgrades the electrical service at Augusta Correctional Center.
Department of Corrections
Correct Environmental Deficiencies
8 17
Provides supplemental funding to an existing umbrella project created to address violations of environmental laws and regulations and included in a consent order with the Environmental Protection Agency.
Department of Corrections
Upgrade Preliminary Wastewater Treatment
9 15
Provides supplemental funding to an existing umbrella project created to install auger grinder equipment in wastewater treatment plants to improve preliminary treatment.
Department of Corrections
Replace Windows and Mechanical Systems
9
Provides for the replacement of windows and mechanical systems in correctional centers.
Department of Corrections
Acquire Office Building for Richmond Probation and Parole District Office
4
Provides for the acquisition of an existing building or the construction of a new building for the Richmond probation and parole district office.
Department of Corrections
Repair and Replace Cell Door Control Systems
12
Provides for the replacement or repair of the electronic panels that control the security doors (cells, building entrances, etc.), as well as the doors and their closing and locking mechanisms.
Department of Corrections
Construct James River Water Line
2
Replaces the water line from the James River Water Treatment Plant that serves the Goochland Courthouse area and surrounding correctional facilities.
Department of Corrections
Install Fire Safety Systems and Exits
6
Upgrades fire safety systems at various correctional facilities.
Department of Corrections
Construct Re-entry Program Buildings
3
Constructs buildings in correctional centers to be used for conducting programs developed for re-entry initiative.
Department of Corrections
Renovate Virginia Correctional Center for Women
5
Provides for extensive renovation of the Virginia Correctional Center for Women in Goochland. Work will include replacement of windows, repair of steam system, replacement of mechanical systems, replacement of showers, waterproofing of basements, as well as other repairs.
Department of Corrections
Replace Caroline Wastewater Treatment System
8
Replaces the outdated wastewater treatment system that serves the Caroline Correctional Unit.
Department of Corrections
Upgrade Buckingham Wastewater Treatment Plant
7
Upgrades the wastewater treatment plant that serves the Buckingham Correctional Center.
Department of Corrections
Replace Security Panels?Sussex I and II
11
Replaces the electronic control panels that control the operation of security doors at Sussex I and Sussex II prisons.
Department of Forensic Science
Expand Eastern Forensic Laboratory Facility
1 3
Provides for the renovation of 15,308 square feet of space on the fifth floor to meet the critical space needs of the controlled substances, toxicology, and questioned documents disciplines. In 2005, the Department of Forensic Science was provided funding to lease 5,777 square feet on the 5th floor in this facility from the City of Norfolk to house the latent prints laboratory and laboratory administrative offices. Approval to occupy and renovate the full 5th floor would result in the Eastern Laboratory expanding to approximately 54,000 square feet which will allow this laboratory to meet current and projected caseloads.
Department of General Services
Renovate Morson Row
6
Renovates Morson Row four-story townhouses that achieved Historic Landmark status on the National Register in 1969. Project includes complete exterior and interior renovations and provides new HVAC, electrical, plumbing, and fire protection systems.
Department of General Services
Demolish Zincke and Aluminum Buildings
7
Demolishes existing Zincke and Aluminum Buildings, stabilizes demolishment site, and relandscapes in accordance with the 2010 Site Master Plan. Project will construct a new central open space, "Virginia Green," realign old 14th and Grace Streets, and reconfigure parking lots behind the VDOT buildings.
Department of Juvenile Justice
Expansion and Renovation to School and Gymnasium
at Natural Bridge Juvenile Correctional Center
1
Expands and renovates the school and gymnasium at
Natural Bridge Juvenile Correctional Center. The gym and the existing
classrooms, library and school administration offices are undersized and
unable to support the school staff, suffer from deferred maintenance issues,
are not handicapped accessible, and are suspected to contain unabated
hazardous materials. These structures require comprehensive renovations to
bring them into compliance with current state building codes, current
fire/life/safety codes, and agency facility standards.
Department of Juvenile Justice
Upgrade Reception and Diagnostic Center (Infirmary and School)
1
Supplements the existing project to construct a new school facility and infirmary at the Reception and Diagnostic Center. The supplement would be to renovate the existing reception center. It would also provide for equipment for the new infirmary.
Department of Juvenile Justice
Renovate Cedar Lodge and Replace Modular Building
2
Renovates one wing of Cedar Lodge and replaces an existing modular building.
Department of Juvenile Justice
Construct New Central Maintenance Building?Bon Air
4
Constructs a dry storage centralized warehouse for the Bon Air complex. A central warehouse will keep heavy delivery vehicles off of the main entry road (Chatsworth Road) approach to the Bon Air Complex, and would isolate and concentrate that traffic to an appropriate less traveled roadway.
Department of Juvenile Justice
Construct New Central Maintenance and Materials Storage Building ?Beaumont
5
Constructs a central maintenance and materials storage building for the Beaumont campus. This building will include shops for carpentry and painting, HVAC/plumbing, electrical, landscaping, small and large engine repair, a vehicle lift, an outdoor wash rack, accommodation for shop material storage, administrative offices and vehicle parking.
Department of Juvenile Justice
Convert Old Dining Hall to Dry Storage Warehouse Facility--Beaumont
6
Converts existing building formerly used as a dining hall into a campus dry-storage warehouse for the Beaumont Juvenile Correctional Center.
Department of Juvenile Justice
Construct Central Warehouse Facility?Bon Air
7
Constructs a new central maintenance and materials storage building for the Bon Air Juvenile Correctional Complex. This building will include shops for carpentry and painting, HVAC/plumbing, electrical and landscaping, an outdoor wash rack for vehicles and equipment, accommodations for shop construction and maintenance material storage, administrative offices and vehicle parking.
Department of Juvenile Justice
Renovate Beaumont Manor House
8
Revitalizes an existing building as a conference center with limited food prep and dining (warming kitchen).
Department of Juvenile Justice
Renovate Historic Bon Air House
9
Provides for renovation of existing building on Bon Air campus.
Department
of Mental Health, Mental Retardation, and Substance
Abuse Behavioral Health and Developmental Services
Abate Environmental Hazards
4 7
Addresses several environmental hazard issues at state facilities, including groundwater cleanup, mold, lead paint and asbestos removal. Includes all phases of the project.
Department of State Police
Construct State Police Castlewood BCI Office
1
Constructs an office for the Bureau of Criminal Investigation in Castlewood.
Department of Veterans Services
Install Generator, Salem Veterans Care Center
1
Provides for full emergency back-up power to the
Salem Veterans Care Center through the installation of a 750 to 1000 kw
generator.
Department of Veterans Services
Construct Addition on the Sitter Barfoot Veterans Care Center
3
Constructs an additional 80 beds to provide the full 240-beds as originally planned for the Sitter-Barfoot Veterans Care Center, located in Richmond adjacent to McGuire Medical Center. Due to changes in the health care delivery system and the rising cost of construction, only 160 beds were constructed in the original project.
Department of Veterans Services
Additions and Renovations, Veterans Care Center Salem
4
Provides additional activities, patient therapy and administrative areas to the existing facility. Currently, patient activities/therapy and administrative areas are inadequate to serve the needs of the facility.
Frontier Culture Museum of Virginia
Construct Early American Industry exhibit
1
Construct a working, water-powered grist mill. The Frontier Culture Museum's master plan calls for the construction of an early American village as a major component of its expansion, and the grist mill is planned as an important structure in this village.
Frontier Culture Museum of Virginia
Expand Infrastructure
2
Combines two infrastructure requests submitted by the agency. Most of the agency's planned expansion will be constructed in an undeveloped area of the property, adjacent to its existing site.
George Mason University
Renovate Fine Arts Building
1 2
Renovates approximately 33,200 gross square feet in the Fine Arts Building originally constructed in 1989. The building will be vacated when the Academic V project is completed and the Art and Visual Technology programs move to the new building. The timing will allow for renovation of the facility to convert space from use for visual arts studio to performing arts space to address program needs of the university.
George Mason University
Renovate Finley Building
2 10
Renovates the Finley Building after the current academic programs move to the new Arlington II building. The renovation will include modifications to support programmatic needs, including academic support and teaching space, associated with the College of Education and Human Development. There will also be a physical connection constructed between Finley and Thompson Halls to visually link the buildings and to protect outdoor program space.
George Mason University
Improve Telecommunications Infrastructure
9
Improves the university?s telecommunications infrastructure to provide additional infrastructure pathways (ductbank, conduit, fiber and copper lines) necessary to ensure critical voice and data services remain available in the event a key pathway is severed; relocates most of the active communications equipment required to support the West Campus; and corrects telecommunications infrastructure problems impacting security, safety, and environmental conditions of the university's telecommunications rooms and pathways.
George Mason University
Renovate Science and Technology Buildings I and II (equipment)
1
Provides funding for equipment for a previously approved project.
Institute for Advanced Learning Research
Construct Greenhouse
1 2
Provides for the construction of a greenhouse needed to further the research efforts of the agency. The agency currently uses growth rooms and chambers. A greenhouse located on property will increase the agency's ability to grow large numbers of plants and expand breeding techniques within an environmental setting.
James Madison University
Construct Technology Infrastructure-Phases 1 & 2
5 6
Replaces a large portion of the university?s technology infrastructure to improve resiliency and more fully meet the bandwidth demand. The project will add network capacity that will enable high-speed delivery of large streams of data to classrooms, labs and desktops throughout the campus.
Jamestown-Yorktown Foundation
Develop outdoor interpretive areas
2
Provides for construction of tiered seating for observing cannon, mortar, and howitzer demonstrations; relocation of the kitchen and farmhouse; construction of a farmhouse addition, demolition and replacement of chimneys; additional reproduction furnishings; construction of an interpretive orientation shelter, a bus shelter, a restroom facility, new aggregate pathways, and a picnic shelter/multi-use area; construction of an artillery firing station; and constuction of a farm site, including tobacco barn, slave quarters, corn crib, animal pens and orchard.
Longwood University
Renovate Space for Faculty and Staff Offices
3
Provides for the renovation of facilities to provide for faculty offices. Faculty positions have increased by 42 over the last several years, and currently, there is insufficient space. This has become a recruiting tool for new faculty.
Longwood University
Renovate Heating Plant Facility
5 3
Renovates utility plant to house an additional redundant steam generation capacity for heat and hot water, expansion capacity, and provide a location for a north campus central chilled distribution water system. The chilled water system will utilize a waste heat exchanger from the boiler stacks. This will add additional energy savings by capturing smoke stack waste. A central chilled water distribution system provides economy of scale, a 24/7 monitoring capability and higher reliability and enhanced control. This will be energy efficient and allow for future expansion of the campus.
Norfolk State University
Renovate the Wilder Center
3 2
Corrects a safety problem that occurred during design/construction related to the auditorium floor. The sections of the auditorium need to be leveled and re-graded and in order to renovate the entire section of the floor, the seats will need to be removed and the floor demolished and reconstructed to meet handicap accessibility and building code requirements. There will also be an upgrade/replacement of communication, audiovisual, and information technology systems to maintain a functional arts presentation facility.
Norfolk State University
Improve Signage, Roads and Campus Boundary, Phase I
4
Provides for a comprehensive campus signage/information system. A new road will also be constructed to connect Presidential Parkway and Jordan Way to improve vehicular circulation and eliminate the need to use city streets.
Old Dominion University
Address Campus Safety, Security and Regulatory
Compliance
6
Addresses the most important safety, physical
security, and regulatory compliance requirements on campus including:
installing electronic locks for exterior building entrances for all major academic
buildings along with emergency telephones across campus, improving and
expanding the campus-wide pedestrian network to reduce vehicular traffic, and
conducting a comprehensive asbestos survey and abating any critical areas
identified.
Old Dominion University
Construct Consolidated Arts Complex (equipment)
2
Provides funding for equipment for a previously approved project.
Radford University
Construct New Computational Sciences Building
1
Constructs a new facility to house the College of Science and Technology (CSAT).
Radford University
Renovate Whitt Hall
2
Renovates Whitt Hall.
Richard Bland College
Renovate Ernst Hall
1
Renovates Ernst Hall, which will provide general classroom space, a music room, faculty office space, an art suite, and lecture hall. Renovations include upgrading electrical, plumbing, chiller, and HVAC systems. Other improvements include installation of fire alarm and suppression systems, egress lighting, card key access, handicap accessibility, energy efficient windows, and roof replacement.
Richard Bland College
Construct Police Department/Technology Services Building
2
Constructs a new facility to house both the college's police and technology services departments.
Roanoke Higher Education Center
Waterproof Building
1
Provides improvements to eliminate numerous leaks and areas in which water penetrates the building.
Southwest Virginia Higher Education Center
Construct Service Corridor and Storage Area
1
Provides for a service corridor and storage area adjacent to the original higher education building and the recently completed wing.
The College of William and Mary
Renovate Andrews Hall
3 5
Covers basic systems renovations to replace building systems, achieve current accessibility standards, and comply with current building codes. Since originally requesting the additional funding for this project, the college has begun a far-reaching study of its arts programs to quantify instructional needs and develop a plan for maximizing the arts experience for its students. The role that Andrews Hall would play in that plan remains to be determined.
The College of William and Mary
Construct Cooling Plant and Replace Utilities, Phase IV
3
Installs a thermal storage ice maker, and makes the final connections to complete the Historic Campus heating and cooling campus project. Along with providing the required connections and backup chiller capacity, this project will provide 3,000 tons of ice per hour to lower electrical costs during peak demand or power outage.
The Science Museum of Virginia
Construct Discovery Park
2
Provides for the construction of a Discovery Park
behind the museum, to include various interactive and educational exhibits
explaining solar power, horticulture, and season changes.
The Science Museum of Virginia
Convert Special Events Tent into Permanent Structure
2
Provides for the design and conversion of the existing outdoor meeting facility into a permanent structure.
University of Mary Washington
Construct Jepson Science Center Addition
1 2
Provides for the
construction of a two-story addition to Jepson Science Center. The Jepson
Science Center opened in the fall of 1998 and houses four academic
departments: Biological Sciences, Chemistry, Environmental Sciences and Geology,
and Physics. Additional space is need needed to meet existing
demand.
University of Mary Washington
Repair/replace Underground Utilities
2 3
Provides for the repair or replacement of underground utilities, including sanitary sewers, water lines, electric distribution, and steam and condensate piping, which are showing progressive patterns of failure due to age and deterioration of system components.
University of Mary Washington
Install University Card Access System
3 5
Provides for installation of card access readers to approximately 16 E&G and 12 non-E&G buildings on the Fredericksburg Campus to enhance campus security.
University of Mary Washington
Improve Storm Water Management
4
Addresses regulatory requirements to adequately accommodate storm water flow.
University of Virginia
Construct Blandy Arboretum Research Labs and Cabins
6
Provides for the construction of a 3,000 gross square foot modern laboratory building, two additional research visitor residence cottages totaling 2,500 gross square feet, and essential infrastructure and utility work, including replacement and extension of water and sewer lines from new well service recently installed.
University of Virginia
Renovate Rugby Administrative Building and Restore Lambeth Colonnade
7
Provides for the rehabilitation
and conversion Rugby Faculty Apartment building into administrative space and
will restore restores the Lambeth
Colonnade. Renovations will include replacement of HVAC, plumbing, and
electrical systems, and installation of new security, fire suppression, media
systems, elevator, replacement and refurbishment of interior finishes,
windows and doors, repair of exterior brick walls and wood trim.
Virginia Commonwealth University
Renovate East Wing of the Oliver Hall Building
5
Provides for the renovation of a 162,000 square foot building originally constructed in 1976. This project renovates a portion of the building into laboratory space for undergraduate instruction. Approximately 7,000 square feet of classroom space will be converted into laboratories to support freshman chemistry classes.
Virginia Community College System
Construct Higher Education Center, Loudoun Campus, Northern Virginia (equipment)
1
Provides funding for equipment for a previously approved project.
Virginia Community College System
Improve Heating, Ventilation, and Air Conditioning, Rappahannock
3 21
Provides for the improvement and upgrade to the heating, ventilation and air conditioning systems at its Glenns Campus. The project scope includes installation of new controls, air distribution, exhaust ventilation, dedicated computer equipment cooling, and replacement of existing boilers, chillers and electrical upgrades.
Virginia Community College System
Renovate Plaza, Structural Repairs Phase II, Annandale Campus, Northern Virginia
6 32
Provides for the renovation
and repairs to correct structural issues for a 3,153 square foot area of a
covered loading dock/walkway on the Annandale campus. The concrete columns
and beams that support this are have
deteriorated to the point that temporary shoring has been installed to insure
the safety of those who must work in and traverse through the area beneath
it. A section of the upper plaza area including an entrance door to the CF
building has been closed to pedestrians.
Virginia Community College System
Renovate Library and Learning Resource Center, Virginia Highlands
8 26
Provides for the renovation of a 39,540 square foot facility constructed in the mid-1980s. The building houses approximately 11 classrooms, 29 faculty and administrative offices.
Virginia Community College System
Construct Workforce Development Center, Piedmont Virginia
9 27
Provides for the acquisition of approximately 5.911 acres including the existing Monticello Visitors? Center, renovation of the existing facility of approximately 10,000 gross square feet, and construction of an 11,000 square foot addition.
Virginia Community College System
Renovate Buildings: Carroll, Bland, Galax, Grayson, Fincastle, and Smyth Halls, Wytheville
10 28
Renovates Carroll and Bland Halls (constructed 1971), Grayson Hall (constructed 1984), Fincastle Hall (constructed 1968), Galax Hall (constructed 1973) and Smyth Hall (constructed 1997.
Virginia Community College System
Renovate Building B, J. Sargeant Reynolds - Parham Road Campus,
11 12
Provides for the renovation and update of 35,000 square feet in Building B at the Parham Road Campus, constructed in the late 1970's. The planned renovations include upgrade of teaching laboratories, classrooms, and support space needed to provide modern state-of-the-art instruction.
Virginia Community College System
Replace Exterior Windows and Doors, Rappahannock
12 29
Provides for the replacement of all exterior windows and doors at its Glenns and Warsaw campuses. Replacement will reduce utility costs in both heating and cooling seasons.
Virginia Community College System
Renovate Phase I Academic and Administration Building, Eastern Shore
16 14
Provides for the renovation of the existing 42,000 square foot Academic and Administration Building originally completed in 1974. Although selected areas of this building have had some minor alterations over the years, it has not undergone extensive renovations aimed at bringing it up to current codes and standards.
Virginia Community College System
Relocate Observatory and Great Dismal Swamp Education Center, Tidewater - Chesapeake Campus
17 41
Provides for the relocation of an observatory from the Portsmouth campus to the Great Dismal Swamp. The relocation and development of the college?s observatory in the swamp will allow for collocation with an educational facility at the Great Dismal Swamp Refuge in partnership with the City of Chesapeake and the U.S. Fish and Wildlife Service. The proposed facility will include 5,500 square feet of Tidewater Community College space to provide a biology laboratory, preparatory spaces, two classrooms, a rooftop observatory and a remote observatory located in the Great Dismal Swamp.
Virginia Community College System
Construct Student Service & Learning Resources Center, Christanna Campus, Southside Virginia
18 16
Provides for the construction of a 35,000 square foot learning resource center on the college?s Daniel campus. The new building would include a library, multi-media learning resource center and a student service center for admissions, counseling, financial aid, and other related support spaces.
Virginia Community College System
Renovate Main Building, Lord Fairfax
19 17
Project provides for a comprehensive renovation of the main academic and administration building on the Middleton campus. The main building was built in 1970.
Virginia Community College System
Renovate Academic Classrooms and Laboratories, Tidewater
21 42
Provides for the renovation of various classrooms and laboratories throughout the college to meet college-approved minimum technology standards. While all instructional spaces in proposed new or renovated facilities will meet these standards, 158 existing instructional spaces are not included in requests to be completed within the next six years.
Virginia Community College System
Construct Addition to Learning Resource Center, Patrick Henry
22 43
Constructs an addition to the Learning Resource Center (built in 1972). The addition would include a multi-media research and development classroom laboratory, model technology training center, center for distance learning with video production capabilities, video conferencing room for faculty, staff, and community use, regional magnet school for technology, and related support spaces.
Virginia Community College System
Renovate and Repair Exterior/Interior Structures, Thomas Nelson
24 44
Provides for renovations to complete exterior and interior structural repairs on various campus buildings.
Virginia Community College System
Construct Maintenance Building, Germanna
26 45
Constructs a 3,000 gross square foot maintenance building on the Fredericksburg campus. The proposed building will contain high bay service areas with operable service doors to house large building and ground maintenance equipment, supplies, and associated offices.
Virginia Community College System
Construct Network Operations Center, Tidewater
27 33
Constructs, or acquires through a capital lease, a new 9,000 square foot facility to house the college's network operations center. The center will provide a modern enterprise data center for management of the college's wide area network (WAN) and services that support administration and instruction at the college?s four campuses, remote centers, and other off-campus sites.
Virginia Community College System
Construct Canopies, Virginia Highlands
29 37
Provides for the expansion to the existing campus canopy system. Canopies connect the three original buildings built on campus in 1969. The project would expand the canopy system to extend to the three additional buildings that have been built since 1969.
Virginia Community College System
Construct New Classroom and Administration Building, Blue Ridge
33 8
Constructs a new 20,000 square feet Classroom and Administration Building on the Weyers Cave College campus.
Virginia Community College System
Construct Engineering and Industrial Technology Building, Danville
34 18
Renovates academic space for the engineering and industrial technology program.
Virginia Cooperative Extension and Agriculture Experiment Station
Construct Animal Production Facility
3
Constructs a new swine facility which includes a house for 130 sows, a farrowing house, and finishing and nursery house for 300 pigs. Support facilities will include an office building with restrooms.
Virginia Institute of Marine Sciences
Replace Research Vessel
1
Provides funding for equipment needed to maintain operations.
Virginia Institute of Marine Sciences
Construct a Consolidated Scientific Research Facility
1 2
Provides for the construction a new 25,000 square foot building to provide research, office and technology space for the Marine Advisory Services, the Center for Coastal Resource Management, the physical sciences modeling group, and the publication/communication and computer centers in a single facility.
Virginia Institute of Marine Sciences
Expand the Fisheries Science Building
2 3
Provides for the construction of a new 13,900 square foot laboratory and office building adjacent to the Fisheries Science Building. The current facility is at its maximum size allowed by the building code for its construction type.
Virginia Institute of Marine Sciences
Replace the Oyster Hatchery
3 4
Constructs a new oyster hatchery with laboratory space for algae culture, larvae culture, and saltwater treatment and polishing; a 10,000 gallon standing water tower reservoir for storage of clean saltwater for fish and shellfish when environmental conditions will not allow pumping water from the York River; storage space for research equipment; a conference/education meeting space; emergency generator; and expansion and improvement of the flow-through nursery located outside the building.
Virginia Institute of Marine Sciences
Construct Facilities Management Maintenance Facility
5
Constructs facility to house administrative offices, maintenance trade shops, automotive and equipment repair garage, grounds keeping, housekeeping, storage, and shipping and receiving.
Virginia Military Institute
Improve Post Infrastructure, Phase I
2 5
Provides for the upgrades or repairs of aging or failing campus infrastructure, including replacing water distribution piping, boiler replacement, lighting upgrade, and sewer line replacement.
Virginia Military Institute
Improve Public Safety and Security on Post, Phase I
3 8
Provides for the construction of a Post police station facility, inclusion of a centralized command and communications center in the Post police facility, installation of a centralized fire and security monitoring system, installation of a centralized building access monitoring system through door controls and video surveillance of critical areas, installation of an emergency communication alert system for the Post, and construction modifications to Post buildings and infrastructure.
Virginia Military Institute
Renovate Post Hospital
4 2
Provides for the renovation of the Post hospital, a historic two-story masonry structure built in 1870. All of the building systems are antiquated and in need of major upgrade. This project will make the building accessible to the disabled, replace windows and doors, upgrade finishes, repair the roof, correct exterior water intrusion issues, replace the HVAC and electrical systems and reconfigure the building space to better address the programmatic needs for this facility.
Virginia Military Institute
Improve Admissions and Financial Aid Offices
5
Provides for renovations to the existing admissions office, and conversion and renovation of the adjacent building #29 to the financial aid office.
Virginia Military Institute
Improve Historic Preservation Sites, Phase I
7
Provides for modest improvements to preserve the historic elements of three structures. These facilities, the Commandants Quarters, the Turman House, and the Cabell House, are contributing historical buildings to the VMI Historic District which was listed as both a National Register property and a National Historic Landmark in 1974.
Virginia Museum of Fine Arts
Renovate Robinson House
1
Provides for the
demolition of the interior of the building, removal of asbestos, repair and reinforcement
of structure, and replacement of major systems, including fire suppression
systems. An addition will be constructed to provide an elevator and
accessible emergency stairs and restrooms. The Robinson House is a, an 1850's farmhouse, is a
historically significant building to the Boulevard Historic District.
Virginia Polytechnic Institute and State University
Renovate Liberal Arts Building
4 7
Provides for the renovation of a building that was constructed in 1899 as a YMCA building. The building currently houses Theater Arts programs and the School of the Arts instructional program. The renovation of the building will allow a complete exterior refurbishment and interior renovation to provide new academic spaces.
Virginia Polytechnic Institute and State University
Construct Newman Library Addition - ARC
8 13
Provides for the construction of a 5,000 gross square foot addition to the east side of Newman Library between the existing loading dock and Squires Student Center. The addition will contain high-density, self-supporting, heavy-duty storage shelving and an automated, robotic retrieval system capable of handling up to one million volumes. The new space will increase the ability to efficiently store and quickly retrieve materials without delay and without additional staff or floor space.
Virginia Polytechnic Institute and State
University
Construct Academic and Student Programs Building
10
Provides additional instructional space, dining
services, and student services on the north side of campus. The proposed
project is envisioned as a 91,200 gross square foot, five story building. The
building plan includes two floors of instructional space, two floors of
dining service space, and one floor of student union space. The two lower
floors will be dining services, the third floor will be student union space,
and the top two floors will be instructional space.
Virginia Polytechnic Institute and State University
Address Fire Alarm Systems and Access
11 1
Provides for needed campus improvements in several educational and general facilities resulting in improvements to accessibility, installation of fire alarm systems, and updates to the needs assessment and planning which are beyond the scope of the Maintenance Reserve program. This project envisions significant accessibility and safety improvements in various campus buildings and exterior campus facilities.
Virginia School for the Deaf and Blind
Renovate Main Hall
1
Renovates Main Hall.
Virginia School for the Deaf and Blind
Repair Chapel
2
Repairs the chapel on the school campus.
Virginia School for the Deaf and Blind
Renovate Bradford Hall
3
Renovates Bradford Hall.
Virginia State University
Renovate Lockett Hall
2
Includes upgrading electrical, plumbing and heating systems, installing central air conditioning and an elevator, upgrading the restrooms to provide handicap access, upgrading the exterior of the building, remediating and abating lead and asbestos, upgrading the interior finishes and communication system, and building a research greenhouse to handle modern research in botany, medicinal plants, and biotechnology.
Virginia State University
Renovate Hunter McDaniel Hall (equipment)
1
Provides funding for equipment for a previously approved project.
Virginia Workers? Compensation Commission
Acquire New Administrative Headquarters
1
Acquires a new administrative headquarters building for the Commission, which will enable the agency to consolidate its operations.
Woodrow Wilson Rehabilitation Center
Renovate Anderson Vocational Building, Phase I
1
Renovates the Anderson Vocational Training building, which has not been significantly renovated since originally constructed in 1968.
Woodrow Wilson Rehabilitation Center
Renovate Dining Hall and Activities Building, Phase II
2
Renovates the dining hall and activities building, originally constructed in 1965.
Agency or Institution
Project Title
Priority
Description
Christopher Newport University
Construct Integrated Science Center, Phase II
2
Constructs a 110,000 square foot academic building (already funded) and renovate 38,000 square feet of an existing academic building. This is the renovation phase of a com